Skip to Main Content
Chaos Envision Ideas Portal

A space for Chaos Envision users to share ideas, give feedback, and shape the future together through votes and collaboration.

ADD A NEW IDEA

Other

3Dconnexion device support

Original post: https://forums.chaos.com/forum/chaos-envision-beta/chaos-envision-beta-wishlist/1226039 The users would like to be able to use 3Dconnection devices with Envision. Specifically, Space Mouse was mentioned. 3Dconnexion devices are desi...
Marcin Miodek 11 months ago in Other 0 Accepted

Ability to grow ivy plants

Logging on behalf of forum user Caecarvalho: https://forums.chaos.com/forum/chaos-envision/chaos-envision-wishlist/1237737-tool-to-make-ivy-plants The idea is to be able to grow realistic ivy plants in Envision scenes. From the user: "I know that ...
Marcin Miodek 8 months ago in Other 0 Accepted

Ability to delete path control points

Logging on behalf of forum user Tehamnes: https://forums.chaos.com/forum/chaos-envision/chaos-envision-issues/1246592-path-control-point-and-delete-key Currently, once the path creation is completed there is no way to delete control points in that...
Marcin Miodek about 2 months ago in Other 0 Accepted

Cesium integration

Integration with the 3D Geospatial platform Cesium: https://cesium.com
Simeon Balabanov 9 months ago in Other 0 Accepted

Save incremental feature

A Save Incremental feature is an important tool in modern 3D rendering software because it allows users to manually create numbered versions of their project files, such as _01, _02, _03, and so on. Instead of overwriting the same file each time, ...
Marcin Miodek 4 months ago in Other 0 Accepted

Autosave / autobackup feature

An autosave and autobackup feature is essential in modern 3D rendering software because 3D projects take a lot of time and effort to create. Scenes often include detailed models, textures, lighting, and simulations that can take hours or even days...
Marcin Miodek 4 months ago in Other 0 Accepted

Project Time Counter - Metrics

Provide a way to track how much time was spent during rendering, and material editing, asset placement. Adding a time-tracking counter can enable the customer to optimize workflows, justify hardware investments, improve project cost estimates, ide...
Lautaro Hunzicker 6 months ago in Other 0 Accepted